Design Build
Contractor: Fry Contractors
Engineer: GSEI
Structural Engineering included analysis of the existing concrete structure to determine if the new heavier weight could be supported. New strengthen was added to the concrete joist. New uni struct was added for boom supports as well as new holes coordinated and cut through the existing wide pan floor system. GSEI coordinate with the contractor and responded quickly to help meet a very tight schedule.The floor hospital floor remained open during construction.